Bare rafters to
finished roof. One day.
Rivers Construction completed a full roof replacement on a residential home in Burlington's North End — one of the most established neighborhoods in the city. This project went deeper than a standard tear-off: the existing deck sheathing was in poor condition and required full replacement before any underlayment or shingles could go down.
The sequence of drone photos tells the complete story. In the morning, old shingles stripped off and a crew working the bare deck — you can see new plywood patches already going in where the worst sheathing came off. Mid-day, the deck crew has finished and two workers are locking down the last of the new plywood while the rest of the team rolls ProArmor underlayment and stages shingle bundles along the ridge. By late afternoon, the roof is done.
For a homeowner, the before and after photos show a clean new roof on a North End Burlington house. What they don't see is every piece of deteriorated sheathing that came off before the first new nail went in — and that's the whole point. A roof replacement done right isn't just about what's on top. It's about what's underneath.
- Full tear-off of existing roofing system
- Complete deck inspection — full sheathing replacement where needed
- Ice & water shield at all eaves, valleys, and penetrations
- ProArmor synthetic underlayment — full deck coverage
- Owens Corning shingles — full installation
- Drip edge, step flashing, and ridge cap
- Full debris removal and site cleanup